So the folded profile of the house is really starting to come together. D&J have finished the framing for the front deck and are busy preparing all the openings for the windows to be installed hopefully by the end of the month. They have also set all the 4x12 floor beams so you are beginning to get some feel for the spaces. We also met with the metal roofing rep and should hopefully have some progress on that front for the next post.
|
Lower bedroom with Barn-form concrete walls and 4x12 Cedar Beams |
|
Knife plate connections of 4x12 cedar beams over top of steel w shape |
|
Afternoon view over pasture from entrance |
|
Enjoying a cold one on the deck while surveying the land |
No comments:
Post a Comment